Skip to content
EECS 4340 Final Review

L01 · Intro

Topic: intro · 28 pages

EECS 4340 — Computer Hardware Design

EECS 4340 — Computer Hardware Design (slide 1)
Slide 1

Course Staff Introductions

Course Staff Introductions (slide 2)
Slide 2
Show slide text

Course Staff Introductions

Instructor: Tanvir Ahmed Khan, tk3070@columbia.edu

Research interests:

  • Efficient and reliable data center processing
  • Computer architecture, compilers, and operating systems

Class info:

Logistical slide introducing the instructor (Prof. Tanvir Ahmed Khan) and the EECS 4340 Courseworks site. The research interests — datacenter efficiency and the boundary between architecture, compilers, and OS — frame why later lectures emphasize branch prediction, caches, and out-of-order execution from a modern, server-class workload perspective.

Student Introductions

Student Introductions (slide 3)
Slide 3
Show slide text

Student Introductions

Introduce yourself: name, level of study (e.g., 1st year CE MS, CS Senior), anything you want to share

Enrollment status:

  • Definitely take it
  • Unsure if I want to continue
  • Waitlisted

Goals from this course:

  • What attracted you to computer hardware design?
  • Do you have any experience relevant to computer hardware design?
  • What do you expect from this course?
    • Build background for an industry job
    • Complete course requirements

An ice-breaker prompting students to declare enrollment intent (definitely taking, unsure, or waitlisted) and personal goals. The goal-setting questions matter for course pacing because Prof. Khan calibrates project depth against how many students plan to use the material industrially versus as a requirement check-off.

Architecture, Organization, Implementation

Architecture, Organization, Implementation (slide 4)
Slide 4
Show slide text

Architecture, Organization, Implementation

Computer architecture: SW/HW interface

  • instruction set
  • memory management and protection
  • interrupts and traps
  • floating-point standard (IEEE)

Organization: also called microarchitecture

  • number/location of functional units
  • pipeline/cache configuration
  • datapath connections

Implementation:

  • low-level circuits

This slide draws the textbook three-level distinction that frames the rest of EECS 4340. Architecture is the contract between software and hardware: the ISA, memory model, exception/trap behavior, and standards like precise interrupts or IEEE-754 floating point. Two CPUs implementing the same architecture run the same binary. Organization (a.k.a. microarchitecture) is how a particular CPU realizes that contract — how many ALUs and load/store units it has, how its caches are sized and laid out, whether it pipelines or executes out of order, and how the TLB connects to the L1. Two CPUs sharing an ISA can differ wildly here (e.g., an Apple M-series core vs. an Intel E-core both run x86_64 binaries via different organizations — well, x86 on M is via translation, but the point about Intel P vs. E cores is direct). Implementation is the physical realization: transistor sizing, clock distribution, voltage domains, layout. The three layers separate concerns so a single ISA can survive decades of organization and implementation changes.

What Is EECS 4340 All About?

What Is EECS 4340 All About? (slide 5)
Slide 5
Show slide text

What Is EECS 4340 All About?

High-level understanding of issues in modern hardware:

  • Dynamic out-of-order processing
  • Memory architecture
  • I/O architecture
  • Multicore / multiprocessor issues

Lectures and Reading

Low-level understanding of critical components:

  • Microarchitecture of out-of-order machines
  • Caches & memory sub-system

Project, Assignment, and Reading

Roadmap of the course split into two depths. The high-level half is delivered through lectures and reading and surveys dynamic out-of-order processing, memory architecture, I/O, and multicore/multiprocessor issues — essentially the four chapters of a modern Hennessy & Patterson. The low-level half is hands-on: projects, lab assignments, and reading drill into the actual microarchitecture of ROB-based out-of-order machines and the cache hierarchy. The slide also signals course balance: lectures focus on breadth, but the project (35% of the grade) is where depth is graded.

Meeting Times

Meeting Times (slide 6)
Slide 6
Show slide text

Meeting Times

Lecture and Lab

  • Monday and Wednesday from 8:40 AM to 9:55 AM

Office Hours

  • See the time and location on the course website, it may change

Logistics: lecture and lab are both scheduled Monday/Wednesday 8:40–9:55 AM, and office hours are pinned to the course website because they may shift mid-semester.

Who Should Take EECS 4340?

Who Should Take EECS 4340? (slide 7)
Slide 7
Show slide text

Who Should Take EECS 4340?

Seniors (ambitious Juniors) & Graduate Students

  1. Computer architects to be
  2. Computer hardware designers
  3. Computer system designers
  4. Those interested in computer systems

Required Background

  • Basic digital logic and computer organization (EECS 3827)
  • Verilog/VHDL experience helpful (covered in labs)

Audience and prerequisites. The intended student is a senior or graduate student aiming at architecture, hardware, or systems work. Prerequisite is EECS 3827 (basic digital logic and computer organization) — that course is where students learn registers, FSMs, single-cycle datapaths, and basic memory hierarchy, all of which EECS 4340 builds on. Verilog/VHDL is preferred but not strictly required because the labs walk through it; this matters for the open-ended Verilog project that dominates the grade.

Grading

Grading (slide 8)
Slide 8
Show slide text

Grading

Tentative grade breakdown

ComponentWeightNotes
Midterm25%
Final25%
Individual projects9%(total of 3: 1% 2% 6%)
Lab assignments6%(total of 6)
Project35%Open-ended (group) processor design in Verilog. Median will be ~70% (so is a distinguisher!)

Participation + discussion count toward the Project grade

Grading breakdown. The two written exams (midterm, final) together weight only 50%; individual projects (9% across three escalating projects worth 1/2/6%) and lab assignments (6% across six labs) cover the small-but-broad practice work. The remaining 35% is the open-ended group Verilog project — explicitly the highest-leverage component and the only one with a distinguisher dynamic (median target ~70%, so heavy compression at the top). Class participation and discussion roll into the project grade rather than being separately weighted, encouraging engagement during architecture critiques without requiring a separate participation rubric.

Grading (Cont.)

Grading (Cont.) (slide 9)
Slide 9
Show slide text

Grading (Cont.)

No late submissions, no kidding

Group studies are encouraged

Group discussions are encouraged

All lab assignments & individual projects must be the results of individual work

There is no tolerance for academic dishonesty. Please refer to the University Policy on cheating and plagiarism. Discussion and group studies are encouraged, but all submitted material must be the student’s individual work (or in the case of the project, individual group work).

Academic-integrity boilerplate with two important pragmatic rules. First, no late submissions — explicitly emphasized (“no kidding”), so students should plan toolchain/server problems to leave slack. Second, collaboration scope is bounded: you may discuss and study together, but lab assignments and individual projects must be each student’s individual work; only the open-ended Verilog project is a true group deliverable.

Hours (and hours) of work

Hours (and hours) of work (slide 10)
Slide 10
Show slide text

Hours (and hours) of work

  • Attend class & conduct lab assignments
    • ~2.5 hrs / week
  • Read book & handouts
    • ~2.5 hrs / week
  • 3 individual projects
    • 4, 6, 25 hrs = 35 hrs / 14 weeks
    • ~2.5 hrs / week
  • Project
    • ~150 hrs / 14 weeks = ~11 hrs / week
  • Studying, etc.
    • ~1.5 hrs / week

Expect to spend ~20 hours / week on this class!!

Time-budget reality check. Class+lab is 2.5 h/week, reading another 2.5 h/week, three escalating individual projects (4 + 6 + 25 hours, average ~2.5 h/week over 14 weeks), and the dominant group project at ~11 hours/week (150 hours total). Plus 1.5 hours of generic studying. Sum: ~20 hours/week, which is the canonical “4-credit graduate course” load and is roughly twice typical undergraduate expectations. The slide’s purpose is to set expectations before drop/add so students who can’t commit drop early.

Trends in computer hardware

Trends in computer hardware (slide 11)
Slide 11

A Paradigm Shift In Computing

A Paradigm Shift In Computing (slide 12)
Slide 12
Show slide text

A Paradigm Shift In Computing

Log-scale plot, 1985–2010, of:

  • Transistors (100,000’s) — rises ~5 orders of magnitude
  • Power (W) — rises and plateaus around 100 W
  • Performance (GOPS) — rises and bends down past ~2000
  • Efficiency (GOPS/W) — rises and bends down past ~2000

Power: A First-Class Architectural Design Constraint — IEEE Computer, April 2001, T. Mudge

  • Power plateau labeled: Limits on heat extraction
  • Efficiency plateau labeled: Limits on energy-efficiency of operations

T. Mudge’s 2001 IEEE Computer paper “Power: A First-Class Architectural Design Constraint,” reproduced as a log-scale plot of four metrics from 1985 to 2010, makes the case that the old growth model broke around 2001–2005. Transistor count keeps climbing exponentially (Moore’s-Law-style — about 5 decades over 25 years), but power per chip plateaus near 100 W because of heat-extraction limits (you can’t pull more heat through a package without exotic cooling), and energy efficiency in GOPS/W plateaus because each operation’s voltage swing × capacitance can no longer shrink as fast as before. With both of those flat, raw Moore’s-Law transistor scaling can no longer be cashed out as proportional single-threaded performance growth. This single chart motivates the rest of the lecture: why we abandoned ever-faster single cores and pivoted to multicore plus DVFS.

A Paradigm Shift In Computing (annotated)

A Paradigm Shift In Computing (annotated) (slide 13)
Slide 13
Show slide text

A Paradigm Shift In Computing

Same 1985–2010 chart, with extra annotations:

  • Limits on heat extraction points at the power plateau
  • Stagnates performance growth points at the performance bend
  • Limits on energy-efficiency of operations points at the efficiency plateau

Bottom timeline arrow:

  • Era of High Performance Computing → c. 2000 → Era of Energy-Efficient Computing

Annotated version of the previous chart. The new arrow at the bottom names the two eras: pre-2000 “High Performance Computing” when frequency and IPC scaled together so single-thread performance roughly doubled every ~18 months, and post-2000 “Energy-Efficient Computing” when the performance curve bends down because the power plateau forces architects to optimize joules-per-instruction, not just instructions-per-second. The third callout, stagnates performance growth, makes explicit the causal chain: heat-extraction limits cap power → frequency scaling stalls → single-thread performance flattens. Everything EECS 4340 covers later — multicore, DVFS, aggressive speculation, deeper memory hierarchies — is a response to this regime change.

Four decades of Dennard Scaling

Four decades of Dennard Scaling (slide 14)
Slide 14
Show slide text

Four decades of Dennard Scaling

Diagram: MOSFET cross-section with scaling factors

  • Voltage, V/αV/\alpha
  • Wiring width W/αW/\alpha
  • Oxide thickness tox/αt_{ox}/\alpha
  • Gate length L/αL/\alpha
  • Source/drain depth xd/αx_d/\alpha
  • p-substrate doping scales as α⋅NA\alpha \cdot N_A

Dennard et al., 1974

  • P=CV2fP = C V^2 f
  • Increase in device count
  • Lower supply voltages
  • → Constant power/chip

The classic Dennard scaling picture from Dennard et al., 1974. If you shrink every linear dimension of a MOSFET — gate length LL, wire width WW, oxide thickness toxt_{ox}, junction depth xdx_d — by a factor α\alpha, and you scale the supply voltage VV by the same factor α\alpha (while increasing doping NAN_A by α\alpha to preserve threshold behavior), then several things happen at once. Capacitance CC scales as 1/α1/\alpha, frequency ff scales as α\alpha, and switching power per transistor P=CV2fP = C V^2 f scales as 1/α2⋅1/α=1/α31/\alpha^2 \cdot 1/\alpha = 1/\alpha^3 for capacitance, voltage-squared, and timing — but if you also pack α2\alpha^2 more transistors into the same chip area, the per-chip power stays roughly constant. The slide’s punchline — constant power/chip — is the magical property that powered four decades of “free” performance: every process node delivered more, faster transistors at the same thermal budget. The next slide explains why this magic stopped.

Leakage Killed Dennard Scaling

Leakage Killed Dennard Scaling (slide 15)
Slide 15
Show slide text

Leakage Killed Dennard Scaling

Leakage:

  • Exponential in inverse of VthV_{th}
  • Exponential in temperature
  • Linear in device count

To switch well

  • must keep Vdd/Vth>3V_{dd}/V_{th} > 3

→ VddV_{dd} can’t go down

Why Dennard scaling broke. Static leakage current through an “off” transistor grows exponentially as the threshold voltage VthV_{th} shrinks (because subthreshold leakage scales as roughly exp⁡(−Vth/kT)\exp(-V_{th}/kT)), grows exponentially with temperature, and grows linearly with device count. To keep gates fast and noise-immune you need Vdd/Vth≳3V_{dd}/V_{th} \gtrsim 3, which means lowering VddV_{dd} requires also lowering VthV_{th} — but lower VthV_{th} explodes leakage power. The combined constraint pins VddV_{dd} near ~1 V from the early 2000s onward. With VddV_{dd} frozen, the V2V^2 in P=CV2fP = C V^2 f no longer shrinks, so per-transistor switching power stops dropping, and packing α2\alpha^2 more transistors per chip now linearly increases chip power instead of staying flat. That is the death of Dennard scaling and the direct cause of the dark-silicon problem and the multicore pivot.

Multicore: Solution to Power-constrained design?

Multicore: Solution to Power-constrained design? (slide 16)
Slide 16
Show slide text

Multicore: Solution to Power-constrained design?

P=CV2FF∝VP = CV^2F \quad F \propto V

Scale clock frequency to 80%

Now add a second core

Bar chart: Performance bar (red on top of teal) vs. Power bar (one half-bar tall) — “Same power budget, but 1.6× performance!”

But:

The textbook multicore argument. Dynamic power is P=CV2FP = CV^2 F and, in the regime where you must lower voltage to lower frequency, F∝VF \propto V, so P∝F3P \propto F^3. Drop the clock to 80% of its original frequency: power drops to 0.83≈0.510.8^3 \approx 0.51 — about half. Now spend the recovered ~50% of your power budget on a second identical core also clocked at 80%. The two-core chip uses 2×0.51≈1.022 \times 0.51 \approx 1.02 of the original single-core power (essentially the same budget) while delivering up to 2×0.8=1.6×2 \times 0.8 = 1.6\times the throughput on parallel work. This is why every chip after ~2005 went multicore. The catch, flagged at the bottom: throughput only materializes if the application can actually be parallelized, which is bounded by Amdahl’s Law — the lecture’s next major topic. DVFS generalizes this trick by adjusting voltage and frequency at runtime.

Memory Wall

Memory Wall (slide 17)
Slide 17
Show slide text

Memory Wall

Log-scale performance vs. year (1985–2010):

  • Processor: 52%/yr. through ~2003, then 15%/yr.
  • Memory: 7%/yr. throughout

Source: Hennessy & Patterson, Computer Architecture: A Quantitative Approach, 4th ed.

Today: 1 mem access ≈ 500 arithmetic ops

The memory wall chart, from H&P 4th edition. Processor performance grew 52%/year from 1986 through ~2003 (the Dennard/frequency era), then slowed to 15%/year as the multicore/IPC era took over. Main-memory access time only improved ~7%/year for the entire window. The compounding gap means a single off-chip DRAM access today costs roughly 500 arithmetic operations of opportunity cost. This single number drives the rest of the memory-hierarchy curriculum: aggressive caches, hardware prefetching, deep store buffers, out-of-order execution to overlap misses, and (in modern systems) hardware-managed TLBs and large LLCs. Without those, a CPU would spend the vast majority of cycles waiting on memory.

Reliability Wall

Reliability Wall (slide 18)
Slide 18
Show slide text

Reliability Wall

Transient faults

  • E.g., high-energy particle strikes

Manufacturing faults

  • E.g., broken connections

Wearout faults

  • E.g., Electromigration

Referenced article: Cores that don’t count / Silent Data Corruptions at Scale (2021), with authors from Google and Sunnyvale.

Images: interconnect/via micrograph, transient-fault MOSFET diagram (Source/Gate/Drain with particle strike), “Testing burn-in”.

Future: device variability (not all transistors created equal)

The reliability wall: as transistors shrink, three classes of faults become first-class architectural concerns. Transient faults are one-time bit flips caused by high-energy cosmic rays or alpha particles striking storage cells; smaller cells store fewer charges so are easier to flip. Manufacturing faults are permanent defects from lithography variation, and wearout faults like electromigration accumulate over a chip’s lifetime and eventually break interconnects. The cited 2021 industry papers (“Cores that don’t count,” “Silent Data Corruptions at Scale”) from Google show that fleet-scale deployments now see individual cores silently producing wrong arithmetic results — not crashes, not parity errors, just quiet computational corruption. The closing point — device variability, not all transistors created equal — is the core thesis: at modern process nodes, two transistors patterned identically perform measurably differently, so future architectures must assume hardware is statistically unreliable.

Renaissance of Comp. Arch. Research

Renaissance of Comp. Arch. Research (slide 19)
Slide 19
Show slide text

Renaissance of Comp. Arch. Research

Moore’s Law & Silicon scaling are dead. What now?

  • Specialization — Democratizing HW design
  • Cloud computing as an “innovation abstraction”
    • My research focus
  • Machine learning - the killer application
  • Moving architecture closer to physics

Khan’s pitch for why now is an exciting time to study architecture. With Moore’s Law and silicon scaling effectively dead, four research directions have opened up. Specialization (domain-specific accelerators, open ISAs like RISC-V, chiplets) is democratizing hardware design so smaller teams can ship custom silicon. Cloud computing as an innovation abstraction — Khan’s own area — treats the datacenter as the new design target where one good microarchitectural improvement is amortized across millions of servers. Machine learning is the workload that finally makes specialization pay off at scale (TPUs, GPUs, NPUs). Moving architecture closer to physics points at near-memory compute, optical interconnects, and analog/neuromorphic devices. The slide frames the rest of the course’s classical out-of-order/cache content as the foundation you need before you can responsibly innovate in any of these directions.

Fundamental concepts

Fundamental concepts (slide 20)
Slide 20

Five key principles to performance

Five key principles to performance (slide 21)
Slide 21
Show slide text

Five key principles to performance

Parallelism

  • Go faster by doing many things at once.

Speculation

  • Guess if you can be right most of the time.

Locality

  • Related data are “near” one another in time and space.

Memoization

  • Programs do the same thing over and over. Remember it.

Amdahl’s Law

  • Make the common case fast… …but speedup ultimately limited by the uncommon case

Khan’s mental model for the rest of the course: every architectural technique you’ll see is a specific instance of one of five principles. Parallelism — pipelining, superscalar issue, multicore, SIMD — exploits independent work. Speculation — branch prediction, speculative execution, value prediction — bets on the common-case answer to hide latency. Locality — caches, TLBs, register allocation — exploits the fact that recent and nearby data are likely to be reused. Memoization — branch predictors as cached outcomes, trace caches, micro-op caches — saves the result of expensive computations to skip them next time. Amdahl’s Law — the meta-principle that optimizing the common case is great but the un-optimized fraction eventually dominates total runtime. These five principles are referenced explicitly throughout the lecture series, so a student who internalizes them now has a vocabulary for every later technique.

Parallelism: Work and Critical Path

Parallelism: Work and Critical Path (slide 22)
Slide 22
Show slide text

Parallelism: Work and Critical Path

Parallelism — the amount of independent sub-tasks available

Work = T1T_1 — time to complete a computation on a sequential system

Critical Path = T∞T_\infty — time to complete the same computation on an infinitely-parallel system

Average Parallelism

Pavg=T1/T∞P_{avg} = T_1 / T_\infty

For a pp wide system

Tp≥max⁡{T1/p,  T∞}T_p \geq \max\{T_1/p,\; T_\infty\}

Pavg≫p  ⇒  Tp≈T1/pP_{avg} \gg p \;\Rightarrow\; T_p \approx T_1/p

Example code:

x = a + b;
y = b * 2
z = (x - y) * (x + y)

Dataflow graph: a,b → + and b → *2, then x,y → - and x,y → +, then → * (final result).

Formal vocabulary for work and critical path from parallel-algorithm theory. Work T1T_1 is wall-clock time on a single processor; critical path T∞T_\infty is wall-clock time given infinitely many processors and zero communication cost. Their ratio Pavg=T1/T∞P_{avg} = T_1/T_\infty is the average parallelism — how many processors you could keep busy on average. For a finite pp-wide machine, Tp≥max⁡{T1/p, T∞}T_p \geq \max\{T_1/p,\, T_\infty\}: you’re bounded both by total work spread across pp workers and by the critical path. When Pavg≫pP_{avg} \gg p, work dominates and you get near-linear speedup (Tp≈T1/pT_p \approx T_1/p); when pp approaches PavgP_{avg}, the critical path takes over and adding cores stops helping. The example computes z=(x−y)(x+y)z = (x-y)(x+y) where x=a+bx = a+b and y=2by = 2b. Sequentially that’s 4 ops (work = 4); in parallel the dataflow graph has depth 3 — the ++ and ∗2*2 run in parallel at level 1, then −- and ++ at level 2, then the final ∗* at level 3 — so T∞=3T_\infty = 3 and Pavg=4/3P_{avg} = 4/3. Modest, but it illustrates that even small expressions have measurable parallelism if you can extract it.

Amortization & Speculation

Amortization & Speculation (slide 23)
Slide 23
Show slide text

Amortization & Speculation

overhead cost: one-time cost to set something up

per-unit cost: cost for per unit of operation

total cost=overhead+per-unit cost×N\text{total cost} = \text{overhead} + \text{per-unit cost} \times N

high overhead OK if distributed over many units

⇒ lower the average cost

average cost=total cost/N=(overhead/N)+per-unit cost\text{average cost} = \text{total cost} / N = (\text{overhead}/N) + \text{per-unit cost}

Speculation — make educated guesses to avoid expensive operations if you can be right most of the time

Make the common case fast

Make the uncommon case correct

Two related performance ideas. Amortization: if a technique has fixed overhead OO and per-use cost cc, total cost across NN uses is O+cNO + cN and average cost is O/N+cO/N + c, which approaches cc as NN grows. So a technique with high one-time cost (e.g., training a branch predictor, filling a cache line, building an indexed page table) is fine if it gets reused enough. This is why architecture is so concerned with hit rates and reuse distances. Speculation is the dual idea: take an expensive-to-resolve operation (a branch, a load whose address depends on an unfinished store) and guess the answer immediately. If you guess right most of the time you avoid the wait; if you guess wrong you must roll back. The two slogans at the bottom — make the common case fast, make the uncommon case correct — are the design discipline for any speculative mechanism: optimize for the prediction-hit path, and reserve a (slower) recovery path for the rare miss.

Locality Principle

Locality Principle (slide 24)
Slide 24
Show slide text

Locality Principle

One’s recent past is a good indication of near future.

  • Temporal Locality: If you looked something up, it is very likely that you will look it up again soon
  • Spatial Locality: If you looked something up, it is very likely you will look up something nearby next

Locality == Patterns == Predictability

Converse: Anti-locality: If you haven’t done something for a very long time, it is very likely you won’t do it in the near future either

The two flavors of locality. Temporal locality: if a program just touched address AA, it is likely to touch AA again soon — so worth caching. Spatial locality: if it touched address AA, it is likely to touch A+δA+\delta for small δ\delta — so worth fetching adjacent bytes proactively (this is why a cache line is 64 bytes, not 1). Khan’s slogan locality == patterns == predictability is the meta-claim that locality is the property that makes hardware speedups possible — without patterns, every memory access is a coin flip and no architectural cleverness can help. The anti-locality corollary motivates eviction policies: things untouched for a long time are unlikely to be touched soon, so LRU is a reasonable eviction strategy. Locality directly supports caches, TLBs, prefetchers, and even the working-set theory underlying virtual memory.

Memoization

Memoization (slide 25)
Slide 25
Show slide text

Memoization

Dual of temporal locality but for computation

If something is expensive to compute, you might want to remember the answer for a while, just in case you will need the same answer again

Why does memoization work??

Examples

  • Branch predictor
    • In my research, I focus on building branch prediction techniques for data center applications
  • Trace cache

Memoization in hardware. While temporal locality caches data you’ve recently accessed, memoization caches the result of a computation you’ve recently performed. The two examples on the slide make it concrete. A branch predictor is a memoization table for the function “will this branch PC be taken?” — past outcomes are stored in a BHT of saturating counters and looked up on the next encounter. Khan notes that his own research builds branch prediction techniques targeted at datacenter workloads, where the working set of branches far exceeds typical predictor capacity. A trace cache memoizes a decoded sequence of instructions following a particular control-flow path; rather than re-fetching and re-decoding, the CPU reads the trace and replays it. Why memoization works is the same answer as why caches work: program behavior is highly repetitive, so storing recent answers pays off across many future identical queries.

Amdahl's Law

Amdahl's Law (slide 26)
Slide 26
Show slide text

Amdahl’s Law

Speedup=timewithout enhancementtimewith enhancement\text{Speedup} = \frac{\text{time}_{\text{without enhancement}}}{\text{time}_{\text{with enhancement}}}

Suppose an enhancement speeds up a fraction ff of a task by a factor of SS

timenew=timeorig⋅((1−f)+f/S)\text{time}_{\text{new}} = \text{time}_{\text{orig}} \cdot \bigl((1-f) + f/S\bigr)

Soverall=1(1−f)+f/SS_{\text{overall}} = \frac{1}{(1-f) + f/S}

Diagram: timeorig\text{time}_{\text{orig}} split into two segments — a (1−f)(1-f) block (un-enhanced) and an ff block (enhanced). timenew\text{time}_{\text{new}} has the same (1−f)(1-f) block but the enhanced part shrinks to f/Sf/S.

The formal statement of Amdahl’s Law. Define speedup as Soverall=Torig/TnewS_{\text{overall}} = T_{\text{orig}}/T_{\text{new}}. If an enhancement covers a fraction ff of original execution time and runs that fraction S×S\times faster, then Tnew=Torig((1−f)+f/S)⟹Soverall=1(1−f)+f/S.T_{\text{new}} = T_{\text{orig}} \bigl((1-f) + f/S\bigr) \quad\Longrightarrow\quad S_{\text{overall}} = \frac{1}{(1-f) + f/S}. The diagram shows why: only the ff-fraction shrinks (to f/Sf/S); the (1−f)(1-f) part is unchanged. Two consequences worth memorizing. First, even for S→∞S \to \infty, the speedup is capped at 1/(1−f)1/(1-f) — so a 90%-parallelizable program (f=0.9f=0.9) maxes out at 10×10\times no matter how many cores you throw at it. Second, modest enhancements applied to large fractions beat huge enhancements applied to tiny fractions. This is the formal version of the make-the-common-case-fast slogan and is the single most-cited result in computer architecture; you’ll see it again when reasoning about CPI components, AMAT miss penalties, and parallel speedup curves.

Readings

Readings (slide 27)
Slide 27
Show slide text

Readings

For this week:

Reading assignment: Hennessy & Patterson, Computer Architecture: A Quantitative Approach, 5th edition, Chapter 1 (fundamentals of quantitative design and analysis — covers the same iron-law and Amdahl’s-Law material at greater depth) and Appendix A (review of pipelining, the prerequisite for L03). Columbia students access it for free through CLIO.

Announcements

Announcements (slide 28)
Slide 28
Show slide text

Announcements

Labs start next Wednesday

  • Please bring your computer
  • Involve graded assignments
  • Attendance is required and graded

Project #1

  • Will be released before Monday (26-Jan-26)
  • Due 4-Feb-26
  • More details in the lab next week

https://courseworks2.columbia.edu/courses/237081

End-of-lecture logistics. Labs start the following Wednesday — students must bring their own laptop, the labs are graded, and attendance counts. Project #1 (the smallest of the three individual projects, weighted 1%) will be released before Monday Jan 26, 2026, with a due date of Feb 4, 2026 — about a 9-day window. Details will be walked through in the next lab session.